• Frequently Asked Questions
1. GENERAL
Herencia is a master planned residential land development on 100 acres. Professionally subdivided into 1/8th acre plots with ready tittles for developments of your dream home.
Herencia is in Thika, 1.5 km off the Thika Superhighway, Exit 16, along Bob Harris Road within the greater Nairobi Metropolitan Region.
Herencia is providing:
- Paved roads
- Footpaths
- Drainage
- Street lighting
- Cycle lanes
- Piped water from 2 boreholes
- Well-manicured and landscaped lawns for common areas
- Boundary wall Perimeter and manned gates and CCTV surveillance
- Underground power reticulation
- Fibre cable connection
- Recreational areas
- 4 Km Jogging track
Herencia will be constructed in 4 phases. 1st phase commenced in 1st Quarter-2023. Phase 1 will consist of 200 plots.
Construction commenced in 1st Q 2023.
The project will be rolled on phases based on demand and sales.
- Gatehouse
- Management offices
- Clubhouse
- Multipurpose courts
- Space for a gym
- Commercial shops
- Herencia has 24hr manned gate houses at all entrances with guards patrolling throughout the day and an electric fence for the exterior perimeter.
- Herencia also has backup alarm systems.
- Each homeowner is at liberty to have additional Securicor company and back up alarm system for their property.
- There is CCTV surveillance at strategic points.
- Perimeter wall fencing around the entire project.
- Well-lit compound with solar street lighting.
The water is supplied through Thika water and sewerage company plus additional 2 boreholes within Herencia. The water is pumped and stored in the underground and elevated water storage tanks.
Common areas will be powered by solar energy. Homeowners are encouraged to make private arrangements for power outages. Install solar or have a standby generator.
According to the architectural typologies provided each home will have a minimum 2 parking spaces.
The community will have designated guest parking around the communal areas such as the mall. But this may be subject to parking fees based on facility management once the community is fully occupied.
The architectural typologies will give provision for hanging lines at the back of each home. No hanging lines will be permitted at the front side of any home.
We will liaise with several suppliers to assist homeowners procure the best materials within the building budget.
The buyer has 60 months from the possession/practical beacon certificate issuance date to begin construction.
We have pool of vetted and qualified contractors you can choose from.





